Open: 60% | Closed: 40%
Final Report Released On: May 26, 2009
2009-3-I-VA-1
Take immediate action to reduce the risk of a catastrophic failure of Tanks 202, 205, and 209 at the Allied Terminals Hill Street facility including but not limited to significantly reducing the maximum liquid levels ("safe fill height") based on sound engineering principles. Report the actions taken to the City of Chesapeake.
Status:
O-ARAR
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
Download
2009-3-I-VA-2
Select and retain a qualified, independent tank engineering firm to evaluate Tanks 202, 205, and 209 and determine their fitness for continued service. The evaluation should be based on recognized and generally accepted good engineering practices, such as API 653 - Tank Inspection, Repair Alteration, and Reconstruction and API 579 - Fitness for Service.
Status:
O-ARAR
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
2009-3-I-VA-3
Within 30 days, provide the report prepared by the independent tank engineering firm to the City of Chesapeake, together with a comprehensive action plan and schedule to address any identified deficiencies.
Status:
O-ARAR
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
2009-3-I-VA-6
Hire a qualified independent reviewer to verify that maximum liquid levels for all tanks at Allied’s Norfolk and Chesapeake terminals meet the requirements of American Petroleum Institute Standard 653, Tank Inspection, Repair, Alteration, and Reconstruction. At a minimum, the review should verify that all requirements for welding, inspection of welds, and In-Service and Out-of-Service tank inspections are met. Make the complete review report for both terminals available to the Cities of Norfolk, Chesapeake, and Portsmouth, Virginia, as well as the Virginia Department of Environmental Quality.
Status:
O-ARE/AR
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
2009-3-I-VA-7
Develop and implement worker safety procedures for initial filling of tanks following major modification or change-in-service. At a minimum, require the exclusion of all personnel from secondary containment during the initial filling.
Status:
O-ARE/AR
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.