The CSB issues safety recommendations to prevent the recurrence or reduce the likelihood or consequences of similar incidents or hazards in the future. Recommendations are issued to a variety of parties, including government entities, safety organizations, trade unions, trade associations, corporations, emergency response organizations, educational institutions, and public interest groups. Recommendations are published in CSB reports and are closed only by vote of the Board. The CSB tracks all recommendations and communicates regularly with recommendations recipients to ensure that the recommended corrective actions are implemented.

For more information, see Frequently Asked Questions about CSB recommendations.


Quick Search

 
Recommendations Status:
 
 
Expand All

Recommendations

Marcus Oil and Chemical Tank Explosion (6 Recommendations)
City of Houston, TX (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: June 06, 2006

2005-2-I-TX-5

Amend the city building ordinances to require all newly installed pressure vessels to comply with the ASME Boiler and Pressure Vessel Code, Section VIII.


Status: Closed - Unacceptable Action/No Response Received
Closed - Unacceptable Action/No Response Received (C - UA/NRR) - Recipient responds by expressing disagreement with the need outlined in the recommendation and the Board concludes that further correspondence on, or discussion of, the matter would not change the recipient?s position.
 

2005-2-I-TX-6

Amend the city building ordinances to require pressure vessel repairs and alterations to comply with the National Board Inspection Code (NB-23).


Status: Closed - Unacceptable Action/No Response Received
Closed - Unacceptable Action/No Response Received (C - UA/NRR) - Recipient responds by expressing disagreement with the need outlined in the recommendation and the Board concludes that further correspondence on, or discussion of, the matter would not change the recipient?s position.
 

Marcus Oil (4 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: June 06, 2006

2005-2-I-TX-1

Implement the requirements of the National Board Inspection Code (NB-23) to repair all pressure vessels that have been altered at the facility. Require the application of NB-23 to all future pressure vessel repairs and alterations


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2005-2-I-TX-2

Install pressure relief devices on all pressure vessels as required by the ASME Boiler and Pressure Vessel Code, Section VIII.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2005-2-I-TX-4

Train personnel on the safe operation and maintenance of the nitrogen system and the importance of controlling oxygen contamination in the inerting gas.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2005-2-I-TX-3

Require all newly installed pressure vessels to conform to the requirements of the ASME Boiler and Pressure Vessel Code, Section VIII.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

MFG Chemical Inc. Toxic Gas Release (16 Recommendations)
City of Dalton, GA (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: April 11, 2006

2004-9-I-GA-8

Establish, equip, and train a hazardous materials response team. Work with the Whitfield County Emergency Management Agency to update the Emergency Operations Plan, clearly defining the roles and responsibilities of the response team.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2004-9-I-GA-9

Revise fire department and police department procedures and training to clearly define facility and evacuation zone access control responsibilities when hazardous chemicals are involved or suspected in an emergency.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendations Status Change Summary

Governor of the State of Georgia (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: April 11, 2006

2004-9-I-GA-12

Clearly designate and define the roles of the agencies responsible for ensuring compliance with all sections of the SARA Title III (Emergency Planning and Community Right-to-Know Act) including review of Local Emergency Response Plans and accompanying attachments, such as standard operating procedures.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2004-9-I-GA-13

Designate a responsible agency and develop a system that will encourage and assist local authorities to obtain and use Risk Management Plans for those facilities that are required to develop this information to aid in the development of the site-specific emergency response plans.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Status Change Summary

GP Chemical (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: April 11, 2006

2004-9-I-GA-5

Implement written procedures for tolling agreements using resources such as the CCPS book Process Safety in Outsourced Manufacturing Operations. Ensure that tolling agreements provide for: - Direct GPC involvement in new process development, including the detailed process hazard analysis and emergency planning, - Active participation in the first production run, as appropriate.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Lyondell Chemical Company (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: April 11, 2006

2004-9-I-GA-6

Revise the applicable sections of the Allyl Alcohol Product Safety Bulletin, appendices, and web page, to emphasize the applicability of the EPA Risk Management Program regulation and OSHA Process Safety Management standard. Clearly identify the threshold quantity of allyl alcohol applicable to each regulation.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2004-9-I-GA-7

Revise the customer site safety assessment process, clearly addressing both PSM and Risk Management Program applicability before shipping allyl alcohol to a new customer. Include a requirement to review the customer's program documents, including the (draft) RMP, and internal and external safety audit or assessment records. Require that appropriate Lyondell health, safety, and environmental personnel review the written customer safety assessment before approving the shipment of allyl alcohol.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

MFG Chemical, Inc. (4 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: April 11, 2006

2004-9-I-GA-1

Develop written procedures that require a comprehensive hazard analysis of new processes, especially those involving reactive chemistry. Ensure the hazard evaluations address critical process controls, overpressure protection, alarms, and other equipment such as vent collection/containment devices to minimize the possibility and consequences of a toxic or flammable release.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2004-9-I-GA-2

Provide EPA Risk Management Program regulation and OSHA Process Safety Management program training to affected personnel to ensure that the facility understands the scope and application of each regulation, and implements all requirements prior to receiving and using covered chemicals.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2004-9-I-GA-3

Create a comprehensive emergency response plan and provide equipment and training that is appropriate to the duties assigned to employees in the event of an emergency.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2004-9-I-GA-4

Implement written tolling procedures using resources such as the CCPS book Process Safety in Outsourced Manufacturing Operations. Ensure effective communication between the toller (MFG) and client throughout the process development, completion of a detailed process hazard analysis, creation of emergency procedures, and dissemination to all parties who would be involved in emergency response situations.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Synthetic Organic Chemical Manufacturers Association (SOCMA) (3 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: April 11, 2006

2004-9-I-GA-14

Revise the SOCMA website to simplify locating the link to the CSB website www.csb.gov, such as adding a link in "More Resources" on the SOCMA home page. Ensure that the CSB website and the report Hazard Investigation: Improving Reactive Hazard Management, Report No. 2001-01-H can be easily located using the SOCMA website search engine.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2004-9-I-GA-15

Develop a ChemStewards Management System Guidance Module that addresses tolling, including the best practices described in the CCPS book Process Safety in Outsourced Manufacturing Operations, and emergency planning involving new products.


Status: Closed - Acceptable Alternative Action
Closed - Acceptable Alternative Action (C - AAA)
 

2004-9-I-GA-16

Develop a formal training module for the ChemStewards Management System Tolling Guidance Module and provide appropriate training to SOCMA member companies. Include in the training program a discussion on the tolling issues identified in the MFG report.


Status: Closed - Acceptable Alternative Action
Closed - Acceptable Alternative Action (C - AAA)
 

Whitfield County, GA (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: April 11, 2006

2004-9-I-GA-10

Establish a Local Emergency Planning Committee to assist the Whitfield County Emergency Management Agency to: - Develop site-specific agency emergency response plans and standard operating procedures, - Develop training programs and conduct drills for emergencies at fixed facilities, - Educate the community regarding proper protective actions, such as shelter-in-place and evacuation procedures.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendations Status Change Summary

2004-9-I-GA-11

Work with the City of Dalton, representatives from local facilities, and relevant community representatives to review and revise the Emergency Operations Plan to: -Update the list of facilities handling hazardous chemicals, including those covered by the EPA Risk Management Program regulation, -Develop standard operating procedures addressing communication of emergency information, evacuation, and shelter-in-place, -Conduct community training and drills that involve operation of the emergency notification system and potential actions in the event of an emergency, -Implement an automated community emergency notification system.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendations Status Change Summary

MGPI Processing, Inc. Toxic Chemical Release (5 Recommendations)
Atchison County Department of Emergency Management (1 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: January 03, 2018

2017-01-I-KS-5

Coordinate planning and training activities to ensure emergency responders within Atchison County are prepared for future incidents involving hazardous materials. The Atchison County Local Emergency Planning Committee should do the following:

a) Review facility Risk Management Plans as they are submitted or revised and conduct pre-planning at Risk Management Program covered facilities and all other facilities within the county that, based on annual Tier II reporting forms, store large amounts of hazardous chemicals.

b) Conduct a full-scale hazardous materials exercise that involves an offsite chemical release scenario within the next three years. The exercise should include participants from local emergency response organizations, hospitals, schools, and fixed facilities. Identify and resolve coordination or communication issues identified during the exercise.

c) Increase participation in state and regional emergency response training and programs. Work with the Kansas Department of Emergency Management to submit a Hazardous Materials Emergency Preparedness (HMEP) grant proposal to assist in funding additional training and pre-planning activities within the county.


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

PDF Document Recommendation Status Change

Harcros Chemicals (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: January 03, 2018

2017-01-I-KS-3

Establish a refresher training program to ensure drivers know the location of various CTMV emergency shut-off devices, when to use them, and the effectiveness of those devices to stop the flow of chemicals during emergencies. The refresher training program should include drills for drivers to simulate the activation of all shut-off devices in defined incident scenarios (e.g., inadvertent mixing, chemical releases, etc.) during unloading operations. Establish a process to evaluate the effectiveness of the refresher training program.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change

2017-01-I-KS-4

Establish a process whereby the respiratory hazards associated with chemical unloading at customer sites are evaluated. The evaluations should, at a minimum, determine whether drivers need emergency escape respirators in the event of an accidental reaction and/or release of chemicals. If the results of the evaluations indicate that respiratory protection is needed, provide the equipment and training for such protection as appropriate. The equipment and training should be provided in accordance with OSHA’s Respiratory Protection Standard (29 C.F.R § 1910.134). The equipment should also be stored in an area that allows for immediate access.


Status: Closed - Exceeds Recommended Action
Closed - Exceeds Recommended Action (C - ERA) - Action on the recommendation meets and surpasses the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change

MGPI Processing, Inc. (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: January 03, 2018

2017-01-I-KS-1

Commission an independent engineering evaluation of the Mod B building and ventilation system and, based on the results of that evaluation, implement design changes and controls to protect occupants from a chemical release. At a minimum, the evaluation should assess the effectiveness of the building ventilation system, indoor and outdoor sources of chemicals, air intake locations, contaminant control methods such as filtration and removal, contaminant monitoring devices, and automation. The engineering evaluation of the ventilation system should consider airborne contaminants during normal operations as well as spills, releases, and chemicals produced from unintended reactions and inadvertent mixing.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendations Status Change Summary

2017-01-I-KS-2

Conduct an evaluation of the Mod B chemical transfer equipment (e.g., fill lines, transfer valves, transfer piping, tanks and other associated equipment) and install appropriate engineering safeguards to prevent and mitigate an unintended reaction, chemical release, or spill during bulk unloading. Where feasible, install safeguards, such as alarms and interlocks, to prevent personnel from opening the incorrect chemical transfer valves during deliveries. In addition, install mitigation measures to automatically shut down the transfer of chemicals into the facility based on process deviations or abnormal conditions (e.g., pressure, temperature, flow or level indications; gas detection).


Status: Closed - Exceeds Recommended Action
Closed - Exceeds Recommended Action (C - ERA) - Action on the recommendation meets and surpasses the objectives envisioned by the Board.
 

PDF Document Recommendations Status Change Summary