Recommendations

The CSB issues safety recommendations to prevent the recurrence or reduce the likelihood or consequences of similar incidents or hazards in the future. Recommendations are issued to a variety of parties, including government entities, safety organizations, trade unions, trade associations, corporations, emergency response organizations, educational institutions, and public interest groups. Recommendations are published in CSB reports and are closed only by vote of the Board. The CSB tracks all recommendations and communicates regularly with recommendations recipients to ensure that the recommended corrective actions are implemented.

For more information, see Frequently Asked Questions about CSB recommendations.


Quick Search
Recommendations Status:
From  
Recommendations
Hoeganaes Corporation Fatal Flash Fires (13 Recommendations)
City of Gallatin, TN (1 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: January 05, 2012

2011-4-I-TN-11

Require all facilities covered by IFC Chapter 13 (2006 edition) to conform to NFPA standards for combustible dusts including NFPA 484.


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

PDF Document Download

City of Gallatin, TN Fire Department (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: January 05, 2012

2011-4-I-TN-12

Ensure that all industrial facilities in the City of Gallatin are inspected periodically against the International Fire Code. All facility inspections shall be documented.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2011-4-I-TN-13

Implement a program to ensure that fire inspectors and response personnel are trained to recognize and address combustible dust hazards.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

Hoeganaes Corporation (4 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: January 05, 2012

2011-4-I-TN-6

Conduct periodic independent audits of the Hoeganaes Gallatin facility for compliance with the following NFPA standards, using knowledgeable experts, and implement all recommended corrective actions:

  • NFPA 484, Standard for Combustible Metals, Metal Powders, and Metal Dusts
  • NFPA 499, Recommended Practice for the Classification of Combustible Dusts and of Hazardous Locations for Electrical Installations in Chemical Process Areas
  • NFPA 497, Recommended Practice for the Classification of Flammable Liquids, Gases, or Vapors and of Hazardous (Classified) Locations for Electrical Installations in Chemical Process Areas
  • NFPA 2, Hydrogen Technologies Code
  • NFPA 2113, Standard on Selection, Care, Use, and Maintenance of Flame-Resistant Garments for Protection of Industrial Personnel Against Flash Fire

 


Status: Open - Unacceptable Response/No Response Received
Open - Unacceptable Response/No Response Received (O - UR) - Recipient responds by expressing disagreement with the need outlined in the recommendation. The Board believes, however, that there is enough supporting evidence to ask the recipient to reconsider.
 

PDF Document Recommendation Status Change Summary

2011-4-I-TN-7

Develop training materials that address combustible dust and plant-specific metal dust hazards and train all employees and contractors. Require periodic (e.g., annual) refresher training for all employees and contractors.


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

PDF Document Recommendation Status Change Summary

2011-4-I-TN-8

Implement a preventive maintenance program and leak detection and leak mitigation procedures for all flammable gas piping and gas processing equipment.


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

PDF Document Recommendation Status Change Summary

2011-4-I-TN-9

Develop and implement a near-miss reporting and investigation policy that includes the following at a minimum:

  • Ensure facility-wide worker participation in reporting all near-miss events and operational disruptions (such as significant iron powder accumulations, smoldering fires, or unsafe conditions or practices) that could result in worker injury.
  • Ensure that the near-miss reporting program requires prompt investigations, as appropriate, and that results are promptly circulated throughout the Hoeganaes Corporation.
  • Establish roles and responsibilities for the management, execution, and resolution of all recommendations from near-miss investigations
  • Ensure the near-miss program is operational at all times (e.g. nights, weekends, holiday shifts).

 


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

PDF Document Recommendation Status Change Summary

International Code Council (ICC) (1 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: January 05, 2012

2011-4-I-TN-4

Revise IFC Chapter 22 Combustible Dust Producing Operations; Section 2204.1 Standards, to require mandatory compliance and enforcement with the detailed requirements of the NFPA standards cited in the chapter, including NFPA 484.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

Metal Powders Producers Association (MPPA) (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: January 05, 2012

2011-4-I-TN-10

Communicate the findings of this report to all your members, e.g. through a safety article in an upcoming monthly newsletter.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Occupational Safety and Health Administration (OSHA) (3 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: January 05, 2012

2011-4-I-TN-1

Ensure that the forthcoming OSHA Combustible Dust Standard includes coverage for combustible metal dusts including iron and steel powders.


Status: Open - Unacceptable Response/No Response Received
Open - Unacceptable Response/No Response Received (O - UR) - Recipient responds by expressing disagreement with the need outlined in the recommendation. The Board believes, however, that there is enough supporting evidence to ask the recipient to reconsider.
 

PDF Document Download

2011-4-I-TN-2

Develop and publish a proposed combustible dust standard for general industry within one year of the approval of this case study.


Status: Open - Unacceptable Response/No Response Received
Open - Unacceptable Response/No Response Received (O - UR) - Recipient responds by expressing disagreement with the need outlined in the recommendation. The Board believes, however, that there is enough supporting evidence to ask the recipient to reconsider.
 

PDF Document Download

2011-4-I-TN-3

Revise the Combustible Dust National Emphasis Program (NEP) to add industry codes for facilities that generate metal dusts (e.g., North American Industrial Classification System, NAICS, code 331111 Iron and Steel Mills, and other applicable codes not currently listed). Send notification letters to all facilities nationwide under these codes to inform them of the
hazards of combustible metal dusts and NEP coverage.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

Tennessee Division of Occupational Safety & Health (TOSHA) (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: January 05, 2012

2011-4-I-TN-5

Revise the state-adopted Dust National Emphasis Program (NEP) to add industry codes for facilities that generate metal dusts (e.g., North American Industrial Classification System, NAICS, code 331111 Iron and Steel Mills, and other applicable codes not currently listed). Send notification letters to all facilities statewide under these codes to inform them of the
hazards of combustible metal dusts and NEP coverage.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Tesoro Refinery Fatal Explosion and Fire (16 Recommendations)
American Petroleum Institute (API) (2 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: May 01, 2014

2010-08-I-WA-10

Revise American Petroleum Institute API RP 941: Steels for Hydrogen Service at Elevated Temperatures
and Pressures in Petroleum Refineries and Petrochemical Plants
to: 

a. Clearly establish the minimum necessary “shall” requirements to prevent HTHA equipment failures using a format such as that used in ANSI/AIHA Z10-2012, Occupational Health and Safety Management Systems;

b. Require the use of inherently safer materials to the greatest extent feasible;

c. Require verification of actual operating conditions to confirm that material of construction selection prevents HTHA equipment failure; and

d. Prohibit the use of carbon steel in processes that operate above 400 ºF and greater than 50 psia hydrogen partial pressure.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

2010-08-I-WA-11

Revise American Petroleum Institute API RP 581: Risk-Based Inspection Technology to:

a. Clearly establish the minimum necessary “shall” requirements to prevent HTHA equipment failures using a format such as that used in ANSI/AIHA Z10-2012, Occupational Health and Safety Management Systems;

b. Prohibit the use of carbon steel in processes that operate above 400 ºF and greater than 50 psia hydrogen partial pressure; and

c. Require verification of actual operating conditions to determine potential equipment damage mechanisms.

 


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

Environmental Protection Agency (EPA) (4 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: May 01, 2014

2010-08-I-WA-1

Revise the Chemical Accident Prevention Provisions under 40 CFR Part 68 to require the documented use
of inherently safer systems analysis and the hierarchy of controls to the greatest extent feasible when
facilities are establishing safeguards for identified process hazards. The goal shall be to reduce the risk of major accidents to the greatest extent practicable, to be interpreted as equivalent to as low as reasonably practicable (ALARP). Include requirements for inherently safer systems analysis to be automatically triggered for all management of change, incident investigation, and process hazard analysis reviews and recommendations, prior to the construction of a new process, process unit rebuilds, significant process repairs, and in the development of corrective actions.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

2010-08-I-WA-2

Until Recommendation 2010-08-I-WA-R1 is in effect, enforce through the Clean Air Act’s General Duty
Clause, section 112(r)(1), 42 U.S.C.§7412(r)(1) the use of inherently safer systems analysis and the
hierarchy of controls to the greatest extent feasible when facilities are establishing safeguards for
identified process hazards.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

2010-08-I-WA-3

Develop guidance for the required use of inherently safer systems analysis and the hierarchy of controls for enforcement under 40 CFR Part 68 and the Clean Air Act’s General Duty Clause, section 112(r)(1),42 U.S.C. §7412(r)(1).


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

2010-08-I-WA-4

Effectively participate in the Tesoro Anacortes Refinery process safety culture survey oversight committee as recommended under recommendation 2010-08-I-WA-R15. Incorporate the expertise of process safety culture experts in the development and interpretation of the safety culture surveys. Ensure the effective participation of the workforce and their representatives in the development of the surveys and the implementation of corrective actions.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

Governor and Legislature of the State of Washington (3 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: May 01, 2014

2010-08-I-WA-5

Based on the findings in this report, augment your existing process safety management regulations for
petroleum refineries in the state of Washington with the following more rigorous goal-setting attributes:

a. A comprehensive process hazard analysis written by the company that includes:

i. Systematic analysis and documentation of all major hazards and safeguards, using the hierarchy of controls to reduce those risks to as low as reasonably practicable (ALARP);

ii. Documentation of the recognized methodologies,rationale and conclusions used to claim that safeguards intended to control hazards will be effective;

iii. Documented damage mechanism hazard review conducted by a diverse team of qualified personnel. This review shall be an integral part of the Process Hazard Analysis cycle and shall be conducted on all PSM-covered process piping circuits and process equipment. The damage mechanism hazard review shall identify potential process damage mechanisms and consequences of failure, and shall ensure effective safeguards are in place to control hazards presented by those damage mechanisms. Require the analysis and incorporation of applicable industry best practices and inherently safer design to the greatest extent feasible into this review; and

iv. Documented use of inherently safer systems analysis and the hierarchy of controls to the greatest extent feasible in establishing safeguards for identified process hazards. The goal shall be to drive the risk of major accidents to As Low As Reasonably Practicable (ALARP). Include requirements for inherently safer systems analysis to be automatically triggered for all Management of Change and Process Hazard Analysis reviews, prior to the construction of new processes, process unit rebuilds, significant process repairs, and in the development of corrective actions from incident investigation recommendations.

b. A thorough review of the comprehensive process hazard analysis by technically competent regulatory
personnel;

c. Required preventative audits and preventative inspections by the regulator; 

d. Require that all safety codes, standards, employer internal procedures and recognized and generally
accepted good engineering practices (RAGAGEP) used in the implementation of the regulations contain adequate minimum requirements;

e. Require an increased role for workers in management of process safety by establishing the rights and responsibilities of workers and their representatives on health and safety-related matters, and the election of safety representatives and establishment of safety committees (with equal representation between management and labor) to serve health and safety-related functions. The elected representatives should have a legally recognized role that goes beyond consultation in activities such as the development of the comprehensive process hazard analysis, management of change, incident investigation, audits, and identification and effective control of hazards. The representatives should also have the authority to stop work that is perceived to be unsafe or that presents a serious hazard until the regulator intervenes to resolve the safety concern. Work force participation practices should be documented by the company to the regulator; and

f. Requires reporting of information to the public to the greatest extent feasible such as a summary of the comprehensive process hazard analysis which includes a list of safeguards implemented and standards utilized to reduce risk, and process safety indicators that demonstrate the effectiveness of the safeguards and management systems.

 


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

2010-08-I-WA-6

Establish a well-funded, well-staffed, technically qualified regulator with a compensation system to
ensure the Washington Department of Labor and Industries regulator has the ability to attract and retain a sufficient number of employees with the necessary skills and experience to ensure regulator technical qualifications. Periodically conduct a market analysis and benchmarking review to ensure the
compensation system remains competitive with Washington petroleum refineries. 


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

2010-08-I-WA-7

Work with the regulator, the petroleum refining industry, labor, and other relevant stakeholders in the
state of Washington to develop and implement a system that collects, tracks, and analyzes process safety leading and lagging indicators from operators and contractors to promote continuous process safety improvements. At a minimum, this program shall: 

a. Require the use of leading and lagging process safety indicators to actively monitor the effectiveness of process safety management systems and safeguards for major accident prevention. Include leading
and lagging indicators that are measureable, actionable, and standardized. Include indicators that measure safety culture, such as incident reporting and action item implementation culture. Require that the reported data be used for continuous process safety improvement and accident prevention;

b. Analyze data to identify trends and poor performer s and publish annual reports with the data at
facility and corporate levels;

c. Require companies to publicly report required indicators annually at facility and corporate levels;

d. Use process safety indicators (1) to drive continuous improvement for major accident prevention
by using the data to identify industry and facility safety trends and deficiencies and (2) to
determine appropriate allocation of regulator resources and inspections; and

e. Be periodically updated to incorporate new learning from world-wide industry improvements in order to drive continuous major accident process safety improvements in Washington.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

Tesoro Anacortes Refinery (1 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: May 01, 2014

2010-08-I-WA-15

Implement a process safety culture continuous improvement program at the Tesoro Anacortes Refinery
including a written procedure for periodic process safety culture surveys across the work force. The
process safety culture program shall be overseen by a tripartite committee of Tesoro management, USW
representatives, Washington State Department of Labor and Industries – Division of Occupational Safety
and Health, and the U.S. Environmental Protection Agency. This oversight committee shall:

a. Select an expert third party that will administer a periodic process safety culture survey;

b. Review and comment on the third party expert report developed from the survey;

c. Oversee the development and effective implementation of action items to address identified process safety culture issues; and

d. Develop process safety culture indicators to measure major accident prevention performance.

The process safety program shall include a focus on items that measure, at a minimum, willingness to
report incidents, normalization of hazardous conditions, burden of proof of safety in plant process safety programs and practices, and management involvement and commitment to process safety. The periodic process safety culture report shall be made available to the plant workforce. The minimum frequency of process safety culture surveys shall be at least once every three years.

 


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

PDF Document Recommendation Status Change Summary

Tesoro Refining & Marketing Company LLC (3 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: May 01, 2014

2010-08-I-WA-12

Actively participate with API in the completion ofrecommendation 2010-08-I-WA-R10. Document this participation.


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

PDF Document Recommendation Status Change Summary

2010-08-I-WA-13

Once recommendation 2010-08-I-WA-R12 is in effect, develop and implement a plan to meet therequirements established through the acceptable completion of recommendation 2010-08-I-WA-R10. Document the implementation of the plan and the corrective actions taken.


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

PDF Document Recommendation Status Change Summary

2010-08-I-WA-14

Revise and improve the Process Hazard Analysis (PHA), the Integrity Operating Window (IOW), and the
damage mechanism hazard review (DMHR) programs and cross-linking among these three programs such that all identified hazards are effectively managed in each program. For all Tesoro refineries require:

a. the IOW to review damage mechanism hazards from the most recent PHA and safeguards identified to control these hazards;

b. the IOW review or revalidation to be conducted at least every five years;

c. the IOW to analyze and incorporate applicable industry best practice, the hierarchy of controls, and inherently safer design to the greatest extent reasonably practicable;

d. the DMHR report to be developed by the DMHR team and not just the “corrosion expert;”

e.the DMHR team to review the operating data to verify an accurate understanding of how the data was obtained, what it represents, and that it appropriately addresses both routine and nonroutine operations;

f. the DMHR and/or IOW review to identify and review gaps between current industry best practices and existing Tesoro practices with regard to material selection and process controls and make recommendations that reduce risks from damage mechanism hazards;

g. the DMHR and IOW review to review applicable Tesoro and industry-wide damage mechanism incidents as part of the respective DMHR or IOW review;

h. the DMHR to review relevant MOCs to fully evaluate the impact of the MOC on damage mechanism hazards;

i. the identification of minimum qualifications for the “corrosion expert” and ensure that the DMHR team has the necessary skills to meet these requirements;

j. for sites that have a corrosion/materials engineer, the corrosion/materials engineer shall be a required participant in the DMHR; 

k. the PHA to review the most recent DMHR and IOW reviews in order to contain a complete record of all identified damage mechanism hazards, evaluate existing safeguards, and propose new safeguards to control the identified hazards;

l. the PHA to review the consequence of damage mechanism hazards identified in the risk-based inspection (RBI) program and IOW reviews to ensure effective safeguards are present to control the damage mechanism hazard; and

m. the PHA to use the hierarchy of controls and implement opportunities for inherently safer design
to the greatest extent reasonably practicable.  


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

PDF Document Recommendation Status Change Summary

USW Local 12-591 (1 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: May 01, 2014

2010-08-I-WA-16

Effectively participate in the Tesoro Anacortes Refinery process safety culture survey oversight
committee as recommended under recommendation 2010-08-I-WA-R15.  


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

Washington State Department of Labor & Industries - Division of Occupational Safety and Health (2 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: May 01, 2014

2010-08-I-WA-8

Perform a verification audit at all Washington petroleum refineries to ensure: 

a. Prevention of HTHA equipment failure and safe operation of the equipment. Audit HTHA prevention and process condition monitoring techniques used at all Washington petroleum refineries. Verify that all affected equipment in use meets the requirements contained in Recommendation 2010-08-I-WA-R10;

b. For nonroutine work, a written hazard evaluation is performed by a multidisciplinary team and, where feasible, conducted during the job planning process prior to the day of the job execution. Verify that each facility has an effective written decision-making protocol used to determine when it is necessary to shut a process down to safely perform work or conduct repairs. Ensure the program reflects the guidance in the CCPS Risk Based Process Safety book related to hazardous nonroutine work; and

c. Effective programs are in place to control of the number of essential personnel present during all
hazardous nonroutine work.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

2010-08-I-WA-9

Effectively participate in the Tesoro Anacortes Refinery process safety culture survey oversight
committee as recommended under recommendation 2010-08-I-WA-R15. Incorporate the expertise of process safety culture experts in the development and interpretation of the safety culture surveys. Ensure
the effective participation of the workforce and their representatives in the development of the surveys and the implementation of corrective actions.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

Allied Terminals Fertilizer Tank Collapse (10 Recommendations)
Allied Terminals Inc. (5 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: May 26, 2009

2009-3-I-VA-1 URGENT!

Take immediate action to reduce the risk of a catastrophic failure of Tanks 202, 205, and 209 at the Allied Terminals Hill Street facility including but not limited to significantly reducing the maximum liquid levels ("safe fill height") based on sound engineering principles. Report the actions taken to the City of Chesapeake.


Status: Closed - No Longer Applicable
Closed - No Longer Applicable (C - NLA) - Due to subsequent events, the recommendation action no longer applies (e.g., the facility was destroyed or the company went out of business).
 

PDF Document Recommendation Status Change Summary

2009-3-I-VA-2 URGENT!

Select and retain a qualified, independent tank engineering firm to evaluate Tanks 202, 205, and 209 and determine their fitness for continued service. The evaluation should be based on recognized and generally accepted good engineering practices, such as API 653 - Tank Inspection, Repair Alteration, and Reconstruction and API 579 - Fitness for Service.


Status: Closed - No Longer Applicable
Closed - No Longer Applicable (C - NLA) - Due to subsequent events, the recommendation action no longer applies (e.g., the facility was destroyed or the company went out of business).
 

PDF Document Recommendation Status Change Summary

2009-3-I-VA-3 URGENT!

Within 30 days, provide the report prepared by the independent tank engineering firm to the City of Chesapeake, together with a comprehensive action plan and schedule to address any identified deficiencies.


Status: Closed - No Longer Applicable
Closed - No Longer Applicable (C - NLA) - Due to subsequent events, the recommendation action no longer applies (e.g., the facility was destroyed or the company went out of business).
 

PDF Document Recommendation Status Change Summary

2009-3-I-VA-6

Hire a qualified independent reviewer to verify that maximum liquid levels for all tanks at Allied’s Norfolk and Chesapeake terminals meet the requirements of American Petroleum Institute Standard 653, Tank Inspection, Repair, Alteration, and Reconstruction. At a minimum, the review should verify that all requirements for welding, inspection of welds, and In-Service and Out-of-Service tank inspections are met. Make the complete review report for both terminals available to the Cities of Norfolk, Chesapeake, and Portsmouth, Virginia, as well as the Virginia Department of Environmental Quality.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

2009-3-I-VA-7

Develop and implement worker safety procedures for initial filling of tanks following major modification or change-in-service. At a minimum, require the exclusion of all personnel from secondary containment during the initial filling.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

Environmental Protection Agency (EPA) (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: May 26, 2009

2009-3-I-VA-4

Revise and reissue the Chemical Emergency Preparedness and Prevention Office Rupture Hazard from Liquid Storage Tanks Chemical Safety Alert. At a minimum, revise the alert to: 1) Include the Allied Terminals tank failure, 2) Discuss the increased rupture hazard during first fill or hydrostatic testing, and 3) List The Fertilizer Institute fertilizer tank inspection guidelines in the reference section.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Fertilizer Institute (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: May 26, 2009

2009-3-I-VA-10

Formally recommend to all member companies the incorporation of The Fertilizer Institute tank inspection guidelines into contracts for the storage of liquid fertilizer at terminals.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Govenor and Legislature of the Commonwealth of Virginia (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: May 26, 2009

2009-3-I-VA-5

Require state regulation of 100,000-gallon and larger fertilizer storage tanks (which presently are located solely along and in the area of the Elizabeth River) or authorize local jurisdictions to regulate these tanks. The regulations should: 1) Address design, construction, maintenance, and inspection of 100,000-gallon and larger liquid fertilizer storage tanks, and 2) Incorporate generally recognized and accepted good engineering practice.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

HMT Inspection, Inc. (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: May 26, 2009

2009-3-I-VA-8

Implement The Fertilizer Institute’s inspection guidelines as part of tank inspector training and inspection procedures for fertilizer tank inspection.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2009-3-I-VA-9

Revise company procedures to require tank inspectors to verify that radiography required as part of the calculation for a maximum liquid level has been performed.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Bethune Point Wastewater Plant Explosion (13 Recommendations)
Camp Dresser & McKee Inc. (3 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: March 13, 2007

2006-3-I-FL-11

Revise CDM policies and procedures to ensure that appropriate quality control measures are applied so that designs specify appropriate materials and comply with applicable safety standards. Ensure that wastewater treatment plant design engineers are aware of the importance of proper material selection as well as the findings and recommendations of this report.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2006-3-I-FL-12

Communicate the findings and recommendations of this report to all companies that contracted with CDM for methanol and other flammable liquid systems that were constructed with aboveground plastic pipe. Recommend replacing plastic pipe with an appropriate material in accordance with NFPA 30 and OSHA 1910.106.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2006-3-I-FL-13

Communicate the findings and recommendations of this report to all companies that contracted with CDM for flammable liquid systems that included a flame arrester. Emphasize the importance of periodic maintenance of the flame arrester to ensure its effective performance.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

City of Daytona Beach (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: March 13, 2007

2006-3-I-FL-3

Adopt city ordinances to require departments to implement policies, practices, and procedures concerning safety and health in the workplace for city employees that are at least as effective as relevant OSHA standards. Emphasize compliance with chemical standards, including hot work procedures (OSHA Welding, Cutting, and Brazing Standard, Sections 1910.251 and 1910.252) and chemical hazard communication (OSHA Hazard Communication Standard 29 CFR 1910.1200). Implement procedures to ensure compliance with these policies, practices and procedures.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2006-3-I-FL-4

Ensure that flammable liquid storage tanks used throughout the city comply with NFPA 30 and minimum federal standards in 29 CFR 1910.106, including appropriate piping and flame arresters.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Governor and Legislature of the State of Florida (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: March 13, 2007

2006-3-I-FL-1

Enact legislation requiring state agencies and each political subdivision (i.e. counties and municipalities) of Florida to implement policies, practices, procedures, including chemical hazards covering the workplace health and safety of Florida public employees that are at least as effective as OSHA. Establish and fund a mechanism to ensure compliance with these standards. Consider legislation providing coverage of Florida public employees under an occupational safety and health program in accordance with Section 18(b) of the Occupational Safety and Health Act of 1970, and Code of Federal Regulations 29 CFR 1956.1.


Status: Closed - Unacceptable Action/No Response Received
Closed - Unacceptable Action/No Response Received (C - UA/NRR) - Recipient responds by expressing disagreement with the need outlined in the recommendation and the Board concludes that further correspondence on, or discussion of, the matter would not change the recipient?s position.
 

2006-3-I-FL-2

Develop and fund a workplace safety and health consultation program for Florida public employees similar to the private sector program currently administered by the Florida Safety Consultation Program at the University of South Florida.


Status: Closed - Unacceptable Action/No Response Received
Closed - Unacceptable Action/No Response Received (C - UA/NRR) - Recipient responds by expressing disagreement with the need outlined in the recommendation and the Board concludes that further correspondence on, or discussion of, the matter would not change the recipient?s position.
 

Methanol Institute (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: March 13, 2007

2006-3-I-FL-9

Work with the Water Environment Federation to prepare and distribute a technical bulletin containing information on the safe receipt, storage, use, and dispensing of methanol in wastewater treatment plants. In addition, include information on basic fire and explosion prevention measures when using bulk methanol (e.g., flame arrester maintenance, hot work programs, electrical classification).


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2006-3-I-FL-10

Work with the Water Environment Federation to prepare safety training materials for wastewater treatment facilities that use methanol.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

National Fire Protection Association (NFPA) (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: March 13, 2007

2006-3-I-FL-5

Revise NFPA 30 to specifically exclude the use of thermoplastics in aboveground flammable liquid service.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

Occupational Safety and Health Administration (OSHA) (1 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: March 13, 2007

2006-3-I-FL-6

Revise 29 CFR 1910.106 to specifically exclude the use of thermoplastics in above ground flammable liquid service.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

Water Environment Federation (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: March 13, 2007

2006-3-I-FL-7

Work with the Methanol Institute to prepare and distribute a technical bulletin containing information on the safe receipt, storage, use, and dispensing of methanol in wastewater treatment plants. In addition, include information on basic fire and explosion prevention measures when using bulk methanol (e.g., flame arrester maintenance, hot work programs, electrical classification).


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

2006-3-I-FL-8

Work with the Methanol Institute to prepare safety training materials for wastewater treatment facilities that use methanol.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

BP America Refinery Explosion (26 Recommendations)
American Petroleum Institute (API) (5 Recommendations)
Open: 60% | Closed: 40%

Final Report Released On: March 20, 2007

2005-4-I-TX-2 URGENT!

In light of the findings concerning the March 23rd incident at BP's Texas City refinery, revise your Recommended Practice 752, Management of Hazards Associated with Location of Process Plant Buildings or issue a new Recommended Practice to ensure the safe placement of occupied trailers and similar temporary structures away from hazardous areas of process plants. Ensure that the new recommended practice: - Protects occupants from accident hazards such as heat, blast overpressure, and projectiles; - Establishes minimum safe distances for trailers and similar temporary structures away from hazardous areas of process plants; - Evaluates the siting of trailers under a separate methodology from permanent structures, since trailers are more susceptible to damage, are more readily relocated, and likely do not need to be placed near hazardous areas.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2005-4-I-TX-3 URGENT!

Issue a safety alert to your membership to take prompt action to ensure the safe placement of occupied trailers away from hazardous areas of process plants.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2005-4-I-TX-4

Revise API Recommended Practice 521, Guide for Pressure Relieving and Depressurizing Systems to ensure that the guidelines: - Identifies overfilling vessels as a potential hazard for evaluation in selecting and designing pressure relief and disposal systems; - Addresses the need to adequately size disposal drums for credible worse-case liquid relief scenarios, based on accurate relief valve and disposal collection piping studies; - Warns against the use of atmospheric blowdown drums and stacks attached to collection piping systems that receive flammable discharges from multiple relief valves and urges the use of appropriate inherently safer alternatives such as a flare system


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

2005-4-I-TX-6

Work together to develop two new consensus American National Standards Institute (ANSI) standards. a. In the first standard, create performance indicators for process safety in the refinery and petrochemical industries. Ensure that the standard identifies leading and lagging indicators for nationwide public reporting as well as indicators for use at individual facilities. Include methods for the development and use of the performance indicators. (CSB2005-04-I-TX-R6A) In the development of each standard, ensure that a. the committees are accredited and conform to ANSI principles of openness, balance, due process, and consensus; b. include representation of diverse sectors such as industry, labor, government, public interest and environmental organizations and experts from relevant scientific organizations and disciplines.


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

PDF Document Download

2005-4-I-TX-7

Work together to develop two new consensus American National Standards Institute (ANSI) standards. b. In the second standard, develop fatigue prevention guidelines for the refining and petrochemical industries that, at a minimum, limit hours and days of work and address shift work. (CSB2005-04-I-TX-R7a) In the development of each standard, ensure that the committees a. are accredited and conform to ANSI principles of openness, balance, due process, and consensus; b. include representation of diverse sectors such as industry, labor, government, public interest and environmental organizations and experts from relevant scientific organizations and disciplines.


Status: Open - Unacceptable Response/No Response Received
Open - Unacceptable Response/No Response Received (O - UR) - Recipient responds by expressing disagreement with the need outlined in the recommendation. The Board believes, however, that there is enough supporting evidence to ask the recipient to reconsider.
 

PDF Document Recommendation Status Change Summary

BP Global Executive Board of Directors (4 Recommendations)
Open: 50% | Closed: 50%

Final Report Released On: March 20, 2007

2005-4-I-TX-1 URGENT!

1. Commission an independent panel to assess and report on the effectiveness of BP North America's corporate oversight of safety management systems at its refineries and its corporate safety culture. Provide the panel with necessary funding, resources, and authority - including full access to relevant data, corporate records, and employee interviews - in order to conduct a thorough, independent, and credible inquiry. 2. Ensure that, at a minimum, the panel report examines and recommends any needed improvements to: Corporate safety oversight, including the safe management of refineries obtained through mergers and acquisitions; Corporate safety culture, including the degree to which: - Corporate officials exercise appropriate leadership to promote adherence to safety management systems; - Process safety is effectively incorporated into management decisionmaking at all levels; - Employees at all levels are empowered to promote improved process safety; - Process safety programs receive adequate resources and are appropriately positioned within organizational structures; Corporate and site safety management systems, specifically: - Near-miss reporting and investigation programs; - Mechanical integrity programs; - Hazard analysis programs, management-of-change programs, and up-todate operating procedures for processes with catastrophic potential; - Siting policies for occupied structures near hazardous operating units. 3. Ensure that the panel has a diverse makeup, including an external chairperson; employee representatives; and outside safety experts, such as experts in process safety; experts in corporate culture, organizational behavior, and human factors; and experts from other high-risk sectors such as aviation, space exploration, nuclear energy, and the undersea navy. 4. Ensure that the report and recommendations of the independent panel, which should be completed within 12 months, are made available to the BP workforce and to the public.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2005-4-I-TX-11

1. Appoint an additional non-executive member of the Board of Directors with specific professional expertise and experience in refinery operations and process safety. Appoint this person to be a member of the Board Ethics and Environmental Assurance Committee.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

2005-4-I-TX-12

2. Ensure and monitor that senior executives implement an incident reporting program throughout your refinery organization that a. encourages the reporting of incidents without fear of retaliation; b. requires prompt corrective actions based on incident reports and recommendations, and tracks closure of action items at the refinery where the incident occurred and other affected facilities; and c. requires communication of key lessons learned to management and hourly employees as well as to the industry.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

2005-4-I-TX-13

3. Ensure and monitor that senior executives use leading and lagging process safety indicators to measure and strengthen safety performance in your refineries.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

BP Texas City Refinery (8 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: March 20, 2007

2005-4-I-TX-14

1. Evaluate your refinery process units to ensure that critical process equipment is safely designed. At a minimum, a. Ensure that distillation towers have effective instrumentation and control systems to prevent overfilling such as multiple level indicators and appropriate automatic controls. b. Configure control board displays to clearly indicate material balance for distillation towers.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2005-4-I-TX-16

3. Work with the United Steelworkers Union and Local 13-1 to establish a joint program that promotes the reporting, investigation, and analysis of incidents, near-misses, process upsets, and major plant hazards without fear of retaliation. Ensure that the program tracks recommendations to completion and shares lessons learned with the workforce.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2005-4-I-TX-15

2. Ensure that instrumentation and process equipment necessary for safe operation is properly maintained and tested. At a minimum, a. Establish an equipment database that captures the history of testing, inspections, repair, and successful work order completion. b. Analyze repair trends and adjust maintenance and testing intervals to prevent breakdowns. c. Require repair of malfunctioning process equipment prior to unit startups.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2005-4-I-TX-17

4. Improve the operator training program. At a minimum, require a. face-to-face training conducted by personnel with process-specific knowledge and experience who can assess trainee competency, and; b. training on recognizing and handling abnormal situations including the use of simulators or similar training tools.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2005-4-I-TX-18

5. Require additional board operator staffing during the startup of process units. Ensure that hazard reviews address staffing levels during abnormal conditions such as startups, shutdowns, and unit upsets.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2005-4-I-TX-19

6. Require knowledgeable supervisors or technically trained personnel to be present during especially hazardous operation phases such as unit startup.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2005-4-I-TX-20

7. Ensure that process startup procedures are updated to reflect actual process conditions.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2005-4-B-TX-1

Revise the maintenance quality control program to require positive material identification testing or another suitable material verification process for all critical service alloy steel piping components removed and reinstalled during maintenance and inform work crews of special material handling precautions.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Center for Chemical Process Safety (CCPS) (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: March 20, 2007

2005-4-I-TX-10

Issue management of change guidelines that address the safe control of the following: a. major organizational changes including mergers, acquisitions, and reorganizations; b. changes in policies and budgets; c. personnel changes; d. staffing during process startups, shutdowns and other abnormal conditions.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

JV Industrial Companies (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: March 20, 2007

2005-4-B-TX-2

Develop / update the written piping component installation quality control procedure to require positive material identification testing or other suitable verification or tracking process for all alloy steel piping components removed during maintenance.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

National Petrochemical and Refiners Association (NPRA) (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: March 20, 2007

2005-4-I-TX-3 URGENT!

Issue a safety alert to your membership to take prompt action to ensure the safe placement of occupied trailers away from hazardous areas of process plants.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

Occupational Safety and Health Administration (OSHA) (3 Recommendations)
Open: 67% | Closed: 33%

Final Report Released On: March 20, 2007

2005-4-I-TX-5

1. Implement a national emphasis program for all oil refineries that focuses on: - The hazards of blowdown drums and stacks that release flammables to the atmosphere instead of to an inherently safer disposal system such as a flare. Particular attention should be paid to blowdown drums attached to collection piping systems servicing multiple relief valves; - The need for adequately sized disposal knockout drums to safely contain discharged flammable liquid based on accurate relief valve and disposal collection piping studies 2. Urge states that administer their own OSHA plan to implement comparable emphasis programs within their respective jurisdictions.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

2005-4-I-TX-8

1. Strengthen the planned comprehensive enforcement of the OSHA Process Safety Management (PSM) standard. At a minimum: a. Identify those facilities at greatest risk of a catastrophic accident by using available indicators of process safety performance and information gathered by the EPA under its Risk Management Program (RMP). b. Conduct, or have conducted, comprehensive inspections, such as those under your Program Quality Verification (PQV) program at facilities identified as presenting the greatest risk. c. Establish the capacity to conduct more comprehensive PSM inspections by hiring or developing a sufficient cadre of highly trained and experienced inspectors. d. Expand the PSM training offered to inspectors at the OSHA National Training Institute.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

2005-4-I-TX-9

2. Amend the OSHA PSM standard to require that a management of change (MOC) review be conducted for organizational changes that may impact process safety including: a. major organizational changes such as mergers, acquisitions, or reorganizations; b. personnel changes, including changes in staffing levels or staff experience; and c. policy changes such as budget cutting.


Status: Open - Unacceptable Response/No Response Received
Open - Unacceptable Response/No Response Received (O - UR) - Recipient responds by expressing disagreement with the need outlined in the recommendation. The Board believes, however, that there is enough supporting evidence to ask the recipient to reconsider.
 

PDF Document Download

United Steelworkers of America (USWA) (2 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: March 20, 2007

2005-4-I-TX-6

Work together to develop two new consensus American National Standards Institute (ANSI) standards. a. In the first standard, create performance indicators for process safety in the refinery and petrochemical industries. Ensure that the standard identifies leading and lagging indicators for nationwide public reporting as well as indicators for use at individual facilities. Include methods for the development and use of the performance indicators.(CSB2005-04-I-TX-R6b) In the development of each standard, ensure that the committees a. are accredited and conform to ANSI principles of openness, balance, due process, and consensus; b. include representation of diverse sectors such as industry, labor, government, public interest and environmental organizations and experts from relevant scientific organizations and disciplines.


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

PDF Document Download

2005-4-I-TX-7

Work together to develop two new consensus American National Standards Institute (ANSI) standards. b. In the second standard, develop fatigue prevention guidelines for the refining and petrochemical industries that, at a minimum, limit hours and days of work and address shift work. (CSB2005-04-I-TX-R7b) In the development of each standard, ensure that the committees a. are accredited and conform to ANSI principles of openness, balance, due process, and consensus; b. include representation of diverse sectors such as industry, labor, government, public interest and environmental organizations and experts from relevant scientific organizations and disciplines.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

USW Local 13-1 (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: March 20, 2007

2005-4-I-TX-21

Work with BP to establish a joint program that promotes reporting, investigating, and analyzing incidents, near-misses, process upsets, and major plant hazards without fear of retaliation. Ensure that the program tracks recommendations to completion and shares lessons learned with the workforce.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

DuPont Corporation Toxic Chemical Releases (14 Recommendations)
American Chemistry Council Phosgene Panel (1 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: September 20, 2011

2010-06-I-WV-11

Revise the Phosgene Safe Practice Guidelines Manual  to

  • Advise against the use of hoses for phosgene transfer that are constructed of permeable cores and materials subject to chlorides corrosion.
  • Include guidance for the immediate reporting and prompt investigation of all potential (near-miss) phosgene releases.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

Compressed Gas Association (CGA) (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: September 20, 2011

2010-06-I-WV-9

Revise CGA P-1, Safe Handling of Compressed Gases in Containers, to include specific requirements for storing and handling highly toxic compressed gas, including enclosure ventilation and alarm requirements at least as protective as Section 7.9, Toxic and Highly Toxic Gases and NFPA 55, Compressed Gases and Cryogenics Fluids Code.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

2010-06-I-WV-10

Revise CGA P-1, Safe Handling of Compressed Gases in Containers, to incorporate by reference CGA E-9, Standard for Flexible, PTFE-lined Pigtails for Compressed Gas Service.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

DuPont Belle Plant (3 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: September 20, 2011

2010-06-I-WV-3

Improve the existing maintenance management by

  • Supplementing the computerized system with sufficient redundancy to ensure tracking and timely scheduling of preventive maintenance for all PSM-critical equipment.
  • Conducting Management-of-Change (MOC) reviews for all changes to preventive maintenance orders for all PSM-critical equipment in the computerized maintenance management system.

 


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Summary Change

2010-06-I-WV-4

Revise the facility emergency response protocol to require that a responsible and accountable DuPont employee always be available (all shifts, all days) to provide timely and accurate information to the Kanawha County Emergency Ambulance Authority (KCEAA) and Metro 9-1-1 dispatchers.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2010-06-I-WV-5

Revise the near-miss reporting and investigation policy and implement a program that includes the following at a minimum:

  • Ensures employee participation in reporting, investigating, analyzing, and recommending corrective actions as appropriate for all near-misses and disruptions of normal operations.
  • Develops and encourages use of an anonymous electronic and/or hard copy near-miss reporting process for all DuPont Belle site employees.
  • Establishes roles and responsibilities for ownership, management, execution, and resolution of recommendations from incident or near-miss investigations at the DuPont Belle facility.
  • Ensures that the near-miss investigation program requires prompt investigations, as appropriate, and that results are promptly circulated to well-suited recipients throughout the DuPont Corp.
  • Ensures that this program is operational at all times (e.g. nights, weekends, and holiday shifts).

 


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

E. I. duPont de Nemours and Company (6 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: September 20, 2011

2010-06-I-WV-6

Revise safeguards for phosgene handling at all DuPont facilities by

  • Requiring that all indoor phosgene production and storage areas, as defined in NFPA 55, have secondary enclosures, mechanical ventilation systems, emergency phosgene scrubbers, and automated audible alarms, which are, at a minimum, consistent with the standards of NFPA 55 for highly toxic gases.
  • Prohibiting the use of hoses with permeable cores and materials susceptible to chlorides corrosion for phosgene transfer.
  • Conducting annual phosgene hazard awareness training for all employees who handle phosgene, including the hazards associated with thermal expansion of entrapped liquid phosgene in piping and equipment.

 


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

2010-06-I-WV-7

Review all DuPont units that produce and handle phosgene that, at a minimum, observe and document site-specific practices for engineering controls, construction materials, PPE, procedures, maintenance, emergency response, and release detection and alarms, and use information from external sources to develop and implement consistent company-wide policies for the safe production and handling of phosgene.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Summary Change

2010-06-I-WV-8

For each DuPont facility that uses, but does not manufacture, phosgene onsite:

  • Conduct a risk assessment of manufacturing phosgene onsite against the current configuration.
  • Communicate the findings of each assessment to compile recommendations applicable to all DuPont phosgene delivery systems.
  • Implement these recommendations.

 


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

2010-06-I-WV-12

Commission an audit in consultation with operations personnel to establish and identify the conditions that cause nuisance alarms at all DuPont facilities. Establish and implement a corporate alarm management program as part of the DuPont PSM Program, including measures to prevent nuisance alarms and other malfunctions in those systems. Include initial and refresher training as an integral part of this effort.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2010-06-I-WV-13

Revise the DuPont PSM standard to require confirmation that all safety alarms/interlocks are in proper working order (e.g., not in an active alarm state) prior to the start-up of all Higher-Hazard Process facilities.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2010-06-I-WV-14

Reevaluate and clarify the DuPont corporate MOC policies to ensure that staff can properly identify and use the distinctions between subtle and full changes and train appropriate personnel how to properly apply the distinctions on any changes in the policy.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

Occupational Safety and Health Administration (OSHA) (2 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: September 20, 2011

2010-06-I-WV-1

Revise OSHA 29 CFR 1910.101, General Industry Standard for Compressed Gases, to require facilities that handle toxic and highly toxic materials in compressed gas cylinders to incorporate provisions that are at least as effective as the 2010 edition of Section 7.9, Toxic and Highly Toxic Gases, in National Fire Protection Association (NFPA) 55, Compressed Gases and Cryogenic Fluids Code, including enclosures, ventilation and treatment systems, interlocked fail-safe shutdown valves, gas detection and alarm systems, piping system components, and similarly relevant layers of protection.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

2010-06-I-WV-2

Take sustained measures to minimize the exposure of hazards to workers handling highly toxic gases from cylinders and associated regulators, gages, hoses, and appliances. Ensure that OSHA managers, compliance officers, equivalent state OSHA plan personnel, and regulated parties conform, under the Process Safety Management Standard (29 CFR 1910.119) Recognized and Generally Accepted Good Engineering Practices (RAGAGEP) provisions, to industry practices at least as effective as the following:

  1. NFPA 55 - Compressed Gases and Cryogenic Fluids Code (2010)
  2. CGA P-1 Safe Handling of Compressed Gases in Containers (2008)
  3. CGA E-9 Standard for Flexible, PTFE-lined Pigtails for Compressed Gas Service (2010)
  4. ASME B31.3 Process Piping (2008)

 


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

PDF Document Recommendation Status Change Summary

Emergency Shutdown Systems for Chlorine Transfer (1 Recommendations)
U.S. Department of Transportation (DOT) (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: June 14, 2007

2005-06-I-LA-1

Expand the scope of DOT regulatory coverage to include chlorine railcar unloading operations. Ensure the regulations specifically require remotely operated emergency isolation devices that will quickly isolate a leak in any of the flexible hoses (or piping components) used to unload a chlorine railcar. The shutdown system must be capable of stopping a chlorine release from both the railcar and the facility chlorine receiving equipment. Require the emergency isolation system be periodically maintained and operationally tested to ensure it will function in the event of an unloading system chlorine leak.


Status: Closed - No Longer Applicable
Closed - No Longer Applicable (C - NLA) - Due to subsequent events, the recommendation action no longer applies (e.g., the facility was destroyed or the company went out of business).
 

PDF Document Recommendation Status Change Summary

Honeywell Chemical Incidents (30 Recommendations)
American Society for Nondestructive Testing (ASNT) (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-28

Communicate the findings and recommendations from the July 20 incident to your membership. Emphasize the need to evaluate test methods for appropriateness in the given equipment.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) (1 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: August 08, 2005

2003-13-I-LA-22

Develop guidance on the effective design and maintenance of HVAC systems and other necessary control room components designed to protect employees and equipment in the event of a release of hazardous materials.


Status: Open - Awaiting Response or Evaluation/Approval of Response
Open - Awaiting Response or Evaluation/Approval of Response (O - ARE/AR) - The recipient has not submitted a substantive response, or the evaluation by CSB staff of a response is pending, or the Board has not yet acted on staff recommendation of status.
 

Baton Rouge Fire Department (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2009-13-I-LA-23

Evaluate and update as necessary community notification procedures to include timely notification of residents in the event of a chemical release. Conduct periodic refresher training with staff on the requirements in the procedures.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Chemical and Metal Industries (C&MI) (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-27

Develop formal procedures for disposition of nonconforming materials received from customers. Ensure that procedures include positive identification prior to shipment.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

East Baton Rouge Parish Office of Homeland Security and Emergency (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-24

Conduct an awareness campaign to educate residents on the proper response during a chemical release. Include instructions on the way residents (including those outside the affected area) can obtain information during an emergency.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Honeywell Baton Rouge Facility (13 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-1

Revise inspection and testing procedures to include effective methods for detecting and preventing leaks in coolers that use chlorine. These procedures should include the use of appropriate NDT methods.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-2

Analyze layers of protection installed to prevent possible consequences of failure of heat exchangers that use chlorine, and implement corrective actions as appropriate. Examples of additional measures include installing monitors on the coolant stream to detect the presence of chlorine, and determining the feasibility of operating the coolant stream at a pressure high enough to prevent the entry of chlorine in the event of a leak.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-3

To address ongoing issues regarding layers of protection and leaks in heat exchangers, revise procedures for performing process hazard analyses for equipment that contains hazardous materials such as chlorine to, at a minimum: - Require an evaluation of the effects of leaks in heat exchangers.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2003-13-I-LA-4

To address ongoing issues regarding layers of protection and leaks in heat exchangers, revise procedures for performing process hazard analyses for equipment that contains hazardous materials such as chlorine to, at a minimum: - Consider the layers of protection necessary to prevent a catastrophic incident and require recommendations to be implemented when existing protection is inadequate.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2003-13-I-LA-5

Revise the incident investigation procedure to ensure that odors inside positive pressure control rooms are investigated, the causes identified, and the appropriate corrective actions implemented. Address causes of the releases as well as entry of the material into the building.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-6

Survey units that handle chlorine, and evaluate the effectiveness of shutdown systems for detecting and preventing the release of chlorine. At a minimum, ensure that shutdown systems and procedures are integrated to stop all potential sources of chlorine.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-7

Conduct training to emphasize that MOC evaluations must consider whether emergency shutdown procedures need to be changed when there are changes in material inventory.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-8

Conduct a hazard analysis (such as a job safety analysis) in the ton-cylinder area, incorporate appropriate findings into unit operating procedures, and train personnel accordingly.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-9

Revise plant procedures on receiving cylinders to require that weights be recorded on incoming materials and suspicious materials be isolated so that hazardous materials are handled appropriately.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-10

Revise the personal protective equipment matrix to include requirements for specific activities, such as draining HF equipment. Refer to the HFIPI guidelines as appropriate.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2003-13-I-LA-11

Develop and implement a program for the identification and management of hazards in nonroutine situations. Ensure that this program covers the following: - Situations where employees are unable to follow standard operating procedures, such as properly purging equipment.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-12

Develop and implement a program for the identification and management of hazards in nonroutine situations. Ensure that this program covers the following: - Circumstances where there is no specific formal procedure for handling a highly hazardous chemical.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-13

Develop and implement a program for the identification and management of hazards in nonroutine situations. Ensure that this program covers the following: - Operations following an emergency shutdown.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

Honeywell International, Inc. (8 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-14

Develop and implement corporate standards to ensure positive pressure control rooms, including the HVAC systems, are designed and maintained to prevent the short-term entry of hazardous materials. Implement corporate standard changes at the Baton Rouge facility, and other Honeywell facilities as appropriate.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-15

Develop and implement procedures for positively identifying material rejected by contractors such as C&MI so that hazardous materials are handled appropriately.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2003-13-I-LA-16

Develop and implement corporate standards for safely handling hydrogen fluoride.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

2003-13-I-LA-17

In light of the findings of this investigation report, conduct a comprehensive audit of fluorine-based manufacturing facilities in your Specialty Materials group facilities. Ensure that the audit addresses: Thoroughness of hazard analysis and adequacy of safeguards.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-18

In light of the findings of this investigation report, conduct a comprehensive audit of fluorine-based manufacturing facilities in your Specialty Materials group facilities. Ensure that the audit addresses: Recognition and management of nonroutine situations.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-19

In light of the findings of this investigation report, conduct a comprehensive audit of fluorine-based manufacturing facilities in your Specialty Materials group facilities. Ensure that the audit addresses: Adherence to standard operating procedures.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-20

In light of the findings of this investigation report, conduct a comprehensive audit of fluorine-based manufacturing facilities in your Specialty Materials group facilities. Implement the recommendations from the audit and communicate the findings to the work force.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

2003-13-I-LA-21

Communicate the findings and recommendations of this report to your employees at fluorine-based manufacturing facilities in your Specialty Materials group.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

Hydrogen Fluoride Industry Practices Institute (HFIPI) (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-25

Conduct a survey of members to determine best industry practices for HF handling activities, such as draining equipment, use of open systems, and nonroutine work. Develop best practices guidance as appropriate and communicate it to your members.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

2003-13-I-LA-26

Communicate the findings and recommendations from the August 13 incident to your membership.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

International Brotherhood of Teamsters Local #5 (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: August 08, 2005

2003-13-I-LA-29

Work with Honeywell to communicate the findings and recommendations of this report to your members employed at the Honeywell Baton Rouge Facility.


Status: Closed - Unacceptable Action/No Response Received
Closed - Unacceptable Action/No Response Received (C - UA/NRR) - Recipient responds by expressing disagreement with the need outlined in the recommendation and the Board concludes that further correspondence on, or discussion of, the matter would not change the recipient?s position.
 

PDF Document Download

U.S. Department of Transportation (DOT) (1 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: August 08, 2005

2005-6-I-LA-1

Expand the scope of DOT regulatory coverage to include chlorine railcar unloading operations. Ensure the regulations specifically require remotely operated emergency isolation devices that will quickly isolate a leak in any of the flexible hoses (or piping components) used to unload a chlorine railcar. The shutdown system must be capable of stopping a chlorine release from both the railcar and the facility chlorine receiving equipment. Require the emergency isolation system be periodically maintained and operationally tested to ensure it will function in the event of an unloading system chlorine leak.


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

Texas Tech University Chemistry Lab Explosion (4 Recommendations)
American Chemical Society (ACS) (1 Recommendations)
Open: 100% | Closed: 0%

Final Report Released On: October 19, 2011

2011-5-CS-TX-2

Develop good practice guidance that identifies and describes methodologies to assess and control hazards that can be used successfully in a research laboratory.


Status: Open - Acceptable Response or Alternate Response
Open - Acceptable Response or Alternate Response (O - ARAR) - Response from recipient indicates a planned action that would satisfy the objective of the recommendation when implemented.
 

Occupational Safety and Health Administration (OSHA) (1 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: October 19, 2011

2011-5-CS-TX-1

Broadly and explicitly communicate to the target audience of research laboratories the findings and recommendations of the CSB Texas Tech report focusing on the message that while the intent of 29 CFR 1910.1450 (Occupational Exposure to Hazardous Chemicals in Laboratories Standard) is to comprehensively address health hazards of chemicals, organizations also need to effectively implement programs and procedures to control physical hazards of chemicals (as defined in 1910.1450(b)). At a minimum:

a.     Develop a Safety and Health Information Bulletin (SHIB) pertaining to the need to control physical hazards of chemicals; and
b.     Disseminate the SHIB (and any related products) on the OSHA Safety and Health Topics website pertaining to Laboratories (http://www.osha.gov/SLTC/laboratories/index.html)

 


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Download

Texas Tech University (2 Recommendations)
Open: 0% | Closed: 100%

Final Report Released On: October 19, 2011

2011-5-CS-TX-3

 

Revise and expand the university chemical hygiene plan (CHP) to ensure that physical safety hazards are addressed and controlled, and develop a verification program that ensures that the safety provisions of the CHP are communicated, followed, and enforced at all levels within the university.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

2011-5-CS-TX-4

Develop and implement an incident and near-miss reporting system that can be used as an educational resource for researchers, a basis for continuous safety system improvement, and a metric for the university to assess its safety progress. Ensure that the reporting system has a single point of authority with the responsibility of ensuring that remedial actions are implemented in a timely manner.


Status: Closed - Acceptable Action
Closed - Acceptable Action (C - AA) - The recipient has completed action on the recommendation. The action taken meets the objectives envisioned by the Board.
 

PDF Document Recommendation Status Change Summary

 
 